Clearfield Aquatic Center

  • Location: Clearfield, UT
  • Project Owner/client: Clearfield City
  • General Contractor: Hughes General Contractors
  • Architect: Naylor Wentworth Lund Architects
  • Mechanical Engineer: Olsen & Peterson
  • Contract Value: Not Available
  • Square Footage: Not Available


J.L. Sorenson Rec Center

  • Location: Herriman, UT
  • Project Owner/client: Salt Lake County
  • General Contractor: Layton Construction
  • Architect: EDA Architects
  • Mechanical Engineer: Van Boerum & Frank Associates
  • Contract Value: 3.5 Million
  • Square Footage: 107,000


J.L. Sorenson Recreation Center–Salt Lake County’s largest and most energy efficient recreation facility. LEED® Gold certification from the U.S. Green Building Council®. The building was designed to use 40 percent less energy and 30 percent less water than a non-LEED certified building of similar size. Regenerative filters reduce water usage and water waste by 30 percent. Additionally, water-conserving plumbing fixtures–including sensor faucets, low-flush/high-flush toilets, and landscaping designed to conserve potable water with the use of secondary irrigation.